Tanzania Railway Line Construction

Construction of standard railway line parallel to the existing metric line between Makutuporo- Tabora Engineering works between KM 785+000-829+305
bt_bb_section_bottom_section_coverage_image
https://gundogdultd.com.tr/wp-content/uploads/2023/04/tanyzanya-lot3-kapak.jpg

About The Project

Work Employer: YAPI MERKEZİ İNŞAAT A.Ş.
Tanzania
Start Date: 01.11.2022
End Date: Ongoing
bt_bb_section_bottom_section_coverage_image